Project: Temporary shelter Saint Martin
Parts provided by Van Sluisveld Group:
– Steel construction
– Facade construction
– Roof construction
– Roof covering
– Rainwater drainage system
– Windows, doors and sliding doors
Description of work: At the airport we have built a temporary shelter what is used for the storage of 2 fire trucks. From engineering to installation, we took care of everything.
Because of the very high wind load, we had to visibly screw the “invisibly attached” sandwich panels here to meet the extreme requirements of St. Martin.